Sites
44
IT load
776 MW
Available
479 MW
Avg industrial
9.1¢

44 sites

2 countries

Capacities are IT load unless marked planned. Free MW is unsold colo IT or remaining hyperscale to commission. Power $ is PUE-inclusive utility cost per kW of IT per month — not colo list price. WUE is litres of water per kWh of IT, shown only where the operator published it (usually a fleet average). Figures are compiled from public disclosures and may lag operator updates.