GDS Kunshan KS1

GDS · Kunshan KS1

IT live
16 MW
Free to lease
1.1 MW
$ / kW·mo
$79
White space
170k ft²

Inventory

93% occupied

Power

16 MWlive

1.1 MW to lease · 14.9 MW in use

White space

170k ft²total

6,364 ft² free · 164k ft² occupied

16k m² · 591 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live16 MW
Free to lease1.1 MW
Utility feed30 MW
Campus / planned24 MW

About 14 MW of the utility feed is cooling, conversion, and house load.

Power cost

$79/kW·mo

8.5¢ industrial · 10.9¢ after PUE 1.28

Per MW·year
$953k
This site · 16 MW
$15M/yr
12 kW rack
$953/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.5M/yr less.

Jiangsu industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
35%
Rack density
12 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Jiangsu. Dual 110 kV. Yangtze Delta industrial tariff.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kunshan, Jiangsu, China

Kunshan, Suzhou, Jiangsu

31.385°, 120.981° · Asia

Tenants / users

Hyperscale, cloud, enterprise, finance

Notes

KS1 Kunshan. Shanghai-adjacent Jiangsu satellite operated through Kunshan Guocheng / Kunshan Wanyu. Lower tariff than Pudong, same latency class.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.