GDS Huizhou HZ1
GDS · Huiyang HZ1
- IT live
- 18 MW
- Free to lease
- 1.3 MW
- $ / kW·mo
- $79
- White space
- 199k ft²
Inventory
93% occupiedPower
18 MWlive
1.3 MW to lease · 16.7 MW in use
White space
199k ft²total
7,159 ft² free · 192k ft² occupied
18k m² · 665 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 17 MW of the utility feed is cooling, conversion, and house load.
Power cost
$79/kW·mo
8.5¢ industrial · 10.9¢ after PUE 1.28
- Per MW·year
- $953k
- This site · 18 MW
- $17M/yr
- 12 kW rack
- $953/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.
Huizhou industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 35%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- China Southern Grid. Dual municipal feeds plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Huizhou, Guangdong, China
Huiyang District, Huizhou, Guangdong
22.788°, 114.456° · Asia
Tenants / users
Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China
Notes
HZ1 Huiyang. Greater Bay east overflow. Converted 2H23, phase 2 still building. IDC license city for GDS Beijing and GDS Suzhou.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.