Expanding
Colocation
Liquid cooling
Tier III

GDS Huizhou HZ1

GDS · Huiyang HZ1

IT live
18 MW
Free to lease
1.3 MW
$ / kW·mo
$79
White space
199k ft²

Inventory

93% occupied

Power

18 MWlive

1.3 MW to lease · 16.7 MW in use

White space

199k ft²total

7,159 ft² free · 192k ft² occupied

18k m² · 665 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live18 MW
Free to lease1.3 MW
Utility feed35 MW
Campus / planned28 MW

About 17 MW of the utility feed is cooling, conversion, and house load.

Power cost

$79/kW·mo

8.5¢ industrial · 10.9¢ after PUE 1.28

Per MW·year
$953k
This site · 18 MW
$17M/yr
12 kW rack
$953/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

Huizhou industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
35%
Rack density
12 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
China Southern Grid. Dual municipal feeds plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Huizhou, Guangdong, China

Huiyang District, Huizhou, Guangdong

22.788°, 114.456° · Asia

Tenants / users

Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China

Notes

HZ1 Huiyang. Greater Bay east overflow. Converted 2H23, phase 2 still building. IDC license city for GDS Beijing and GDS Suzhou.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.