GDS Chengdu Pidu
GDS · Pidu Tiansheng
- IT live
- 16 MW
- Free to lease
- 1.1 MW
- $ / kW·mo
- $70
- White space
- 170k ft²
Inventory
93% occupiedPower
16 MWlive
1.1 MW to lease · 14.9 MW in use
White space
170k ft²total
6,364 ft² free · 164k ft² occupied
16k m² · 591 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 14 MW of the utility feed is cooling, conversion, and house load.
Power cost
$70/kW·mo
7.5¢ industrial · 9.6¢ after PUE 1.28
- Per MW·year
- $841k
- This site · 16 MW
- $13M/yr
- 12 kW rack
- $841/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.7M/yr less.
Sichuan industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 50%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- State Grid Sichuan. Dual municipal feeds. Hydro-heavy western China mix.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Chengdu, Sichuan, China
Tiansheng Road, Pidu District, Chengdu, Sichuan
30.808°, 103.892° · Asia
Tenants / users
Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China
Notes
Pidu Tiansheng campus. Distinct from the generic Chengdu row already in the index. 2Q26 Chengdu inventory booking of 23 MW. Western China DR and cloud.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.