GDS Changshu Campus
GDS · Changshu CS1-CS3
- IT live
- 48 MW
- Free to lease
- 3.4 MW
- $ / kW·mo
- $79
- White space
- 563k ft²
Inventory
93% occupiedPower
48 MWlive
3.4 MW to lease · 44.6 MW in use
White space
563k ft²total
17k ft² free · 546k ft² occupied
52k m² · 1,561 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 64.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$79/kW·mo
8.5¢ industrial · 10.9¢ after PUE 1.28
- Per MW·year
- $953k
- This site · 48 MW
- $46M/yr
- 15 kW rack
- $1,191/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $29M/yr less.
Jiangsu industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 40%
- Rack density
- 15 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- State Grid Jiangsu. Dual 110 kV. Yangtze Delta industrial tariff.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Changshu, Jiangsu, China
11 Wangwan North Road, Changshu, Suzhou, Jiangsu
31.678°, 120.752° · Asia
Tenants / users
Hyperscale, cloud, AI training — Eastern Data, Western Compute
Notes
Changshu CS1-CS3 purpose-built campus. 1Q26 and 2Q26 hyperscale bookings of 41-48 MW. New Jiangsu growth market next to Taicang. Operated via Changshu Yuntu Huichuang / GDS Suzhou.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.