Operational
Colocation
Liquid cooling
Tier III

GDS Langfang LF2

GDS · Langfang Anci

IT live
18 MW
Free to lease
1.3 MW
$ / kW·mo
$80
White space
156k ft²

Inventory

93% occupied

Power

18 MWlive

1.3 MW to lease · 16.7 MW in use

White space

156k ft²total

7,159 ft² free · 149k ft² occupied

15k m² · 665 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live18 MW
Free to lease1.3 MW
Utility feed27.5 MW
Campus / planned22 MW

About 9.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$80/kW·mo

8.6¢ industrial · 11¢ after PUE 1.28

Per MW·year
$964k
This site · 18 MW
$17M/yr
12 kW rack
$964/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

Hebei industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
40%
Rack density
12 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Hebei. Dual 110 kV. Beijing overflow corridor.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Langfang, Hebei, China

Anci District, Langfang, Hebei

39.517°, 116.713° · Asia

Tenants / users

Hyperscale, cloud, AI training — Eastern Data, Western Compute

Notes

LF2 Anci. Second Langfang hall next to LF1 already in the index. Hebei overflow for Beijing hyperscale.