GDS Tianjin TJ1
GDS · Tianjin TJ1
- IT live
- 16 MW
- Free to lease
- 1.1 MW
- $ / kW·mo
- $87
- White space
- 170k ft²
Inventory
93% occupiedPower
16 MWlive
1.1 MW to lease · 14.9 MW in use
White space
170k ft²total
6,364 ft² free · 164k ft² occupied
16k m² · 591 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 14 MW of the utility feed is cooling, conversion, and house load.
Power cost
$87/kW·mo
9.3¢ industrial · 11.9¢ after PUE 1.28
- Per MW·year
- $1M
- This site · 16 MW
- $17M/yr
- 12 kW rack
- $1,043/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.
Tianjin industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 35%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- State Grid Tianjin. Dual municipal feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Tianjin, Tianjin, China
Wuqing / Beichen data-center belt, Tianjin
39.085°, 117.198° · Asia
Tenants / users
Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China
Notes
TJ1 purpose-built. Beijing-Tianjin-Hebei triangle. Phase 2 still filling. IDC license city for GDS Beijing.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.