Expanding
Colocation
Liquid cooling
Tier III

GDS Langfang LF13

GDS · Langfang LF13

IT live
24 MW
Free to lease
1.7 MW
$ / kW·mo
$80
White space
200k ft²

Inventory

93% occupied

Power

24 MWlive

1.7 MW to lease · 22.3 MW in use

White space

200k ft²total

8,400 ft² free · 192k ft² occupied

19k m² · 780 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live24 MW
Free to lease1.7 MW
Utility feed40 MW
Campus / planned32 MW

About 16 MW of the utility feed is cooling, conversion, and house load.

Power cost

$80/kW·mo

8.6¢ industrial · 11¢ after PUE 1.28

Per MW·year
$964k
This site · 24 MW
$23M/yr
15 kW rack
$1,205/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

Hebei industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
45%
Rack density
15 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Hebei. Dual 110 kV. Beijing overflow corridor.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Langfang, Hebei, China

Langfang, Hebei

39.535°, 116.695° · Asia

Tenants / users

Hyperscale, cloud, AI training — Eastern Data, Western Compute

Notes

LF13 purpose-built 2H23 with phases 2-3 in 2024. One of GDS's larger owned Hebei halls. Complements LF1 and LF4.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.