Expanding
Colocation
Liquid cooling
Tier III

GDS Langfang LF4

GDS · Langfang LF4

IT live
22 MW
Free to lease
1.5 MW
$ / kW·mo
$80
White space
225k ft²

Inventory

93% occupied

Power

22 MWlive

1.5 MW to lease · 20.5 MW in use

White space

225k ft²total

7,700 ft² free · 217k ft² occupied

21k m² · 715 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live22 MW
Free to lease1.5 MW
Utility feed45 MW
Campus / planned36 MW

About 23 MW of the utility feed is cooling, conversion, and house load.

Power cost

$80/kW·mo

8.6¢ industrial · 11¢ after PUE 1.28

Per MW·year
$964k
This site · 22 MW
$21M/yr
15 kW rack
$1,205/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

Hebei industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
45%
Rack density
15 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Hebei. Dual 110 kV. Beijing overflow corridor.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Langfang, Hebei, China

Langfang, Hebei

39.529°, 116.718° · Asia

Tenants / users

Hyperscale, cloud, AI training — Eastern Data, Western Compute

Notes

LF4 purpose-built, owned. Phase 2 in service. Part of the 1Q26 Langfang inventory-plus-new-build bookings (83 MW campus add).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.