GDS Beijing BJ13/BJ14 Tongzhou Liangli
GDS · Tongzhou Liangli
- IT live
- 32 MW
- Free to lease
- 2.2 MW
- $ / kW·mo
- $104
- White space
- 300k ft²
Inventory
93% occupiedPower
32 MWlive
2.2 MW to lease · 29.8 MW in use
White space
300k ft²total
11k ft² free · 289k ft² occupied
28k m² · 1,041 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 28 MW of the utility feed is cooling, conversion, and house load.
Power cost
$104/kW·mo
11.1¢ industrial · 14.2¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 32 MW
- $40M/yr
- 15 kW rack
- $1,556/mo
3.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.
Beijing industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 30%
- Rack density
- 15 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- State Grid Beijing. Dual municipal feeds plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Beijing, Beijing, China
Liangli 5th Street, Tongzhou District, Beijing
39.808°, 116.702° · Asia
Tenants / users
Hyperscale, cloud, AI training — Eastern Data, Western Compute
Notes
BJ13 and BJ14 purpose-built on Liangli 5th Street. Owned campus, not a converted hall. Largest tracked GDS Beijing build after the original Chaoyang cluster.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.