GDS Wuhan WH1
GDS · Wuhan WH1
- IT live
- 8 MW
- Free to lease
- 0.6 MW
- $ / kW·mo
- $79
- White space
- 125k ft²
Inventory
93% occupiedPower
8 MWlive
0.6 MW to lease · 7.4 MW in use
White space
125k ft²total
3,500 ft² free · 122k ft² occupied
12k m² · 325 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 12 MW of the utility feed is cooling, conversion, and house load.
Power cost
$79/kW·mo
8.5¢ industrial · 10.9¢ after PUE 1.28
- Per MW·year
- $953k
- This site · 8 MW
- $7.6M/yr
- 10 kW rack
- $794/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.8M/yr less.
Hubei industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 40%
- Rack density
- 10 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- State Grid Hubei. Dual municipal feeds. Wuhan Optics Valley.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Wuhan, Hubei, China
Optics Valley, Wuhan, Hubei
30.478°, 114.398° · Asia
Tenants / users
Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China
Notes
WH1 converted Optics Valley hall. IDC license city. Phase 2 still pipeline. Central China DR, not a national-hub AI campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.