Expanding
Colocation
Liquid cooling
Tier III

GDS Wuhan WH1

GDS · Wuhan WH1

IT live
8 MW
Free to lease
0.6 MW
$ / kW·mo
$79
White space
125k ft²

Inventory

93% occupied

Power

8 MWlive

0.6 MW to lease · 7.4 MW in use

White space

125k ft²total

3,500 ft² free · 122k ft² occupied

12k m² · 325 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease0.6 MW
Utility feed20 MW
Campus / planned16 MW

About 12 MW of the utility feed is cooling, conversion, and house load.

Power cost

$79/kW·mo

8.5¢ industrial · 10.9¢ after PUE 1.28

Per MW·year
$953k
This site · 8 MW
$7.6M/yr
10 kW rack
$794/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.8M/yr less.

Hubei industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
40%
Rack density
10 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Hubei. Dual municipal feeds. Wuhan Optics Valley.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Wuhan, Hubei, China

Optics Valley, Wuhan, Hubei

30.478°, 114.398° · Asia

Tenants / users

Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China

Notes

WH1 converted Optics Valley hall. IDC license city. Phase 2 still pipeline. Central China DR, not a national-hub AI campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.