GDS Ulanqab Campus
GDS · Ulanqab
- Planned IT
- 70 MW
- Free to lease
- 70 MW
- $ / kW·mo
- $59
- White space
- 313k ft²
Inventory
0% occupiedPower
70 MWlive
70 MW to lease · 0 MW in use
White space
313k ft²total
313k ft² free · — occupied
29k m² · 29k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$59/kW·mo
6.8¢ industrial · 8¢ after PUE 1.18
- Per MW·year
- $703k
- This site · 70 MW
- $49M/yr
- 18 kW rack
- $1,054/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.
Inner Mongolia industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 80%
- Rack density
- 18 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- State Grid Inner Mongolia. Wind and solar plus coal backup. Eastern Data, Western Compute hub.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ulanqab, Inner Mongolia, China
Ulanqab, Inner Mongolia
40.995°, 113.132° · Asia
Tenants / users
Hyperscale, cloud, AI training — Eastern Data, Western Compute
Notes
Ulanqab new build. 2Q26 hyperscale booking 70 MW (14,217 sqm). Inner Mongolia national hub. Wind-heavy Eastern Data, Western Compute. Distinct from Huawei Horinger already in the index.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.