Under construction
Colocation
Liquid cooling
Tier III

GDS Ulanqab Campus

GDS · Ulanqab

Planned IT
70 MW
Free to lease
70 MW
$ / kW·mo
$59
White space
313k ft²

Inventory

0% occupied

Power

70 MWlive

70 MW to lease · 0 MW in use

White space

313k ft²total

313k ft² free · — occupied

29k m² · 29k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease70 MW
Utility feed—
Campus / planned70 MW

Power cost

$59/kW·mo

6.8¢ industrial · 8¢ after PUE 1.18

Per MW·year
$703k
This site · 70 MW
$49M/yr
18 kW rack
$1,054/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.

Inner Mongolia industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
80%
Rack density
18 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
State Grid Inner Mongolia. Wind and solar plus coal backup. Eastern Data, Western Compute hub.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

18 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ulanqab, Inner Mongolia, China

Ulanqab, Inner Mongolia

40.995°, 113.132° · Asia

Tenants / users

Hyperscale, cloud, AI training — Eastern Data, Western Compute

Notes

Ulanqab new build. 2Q26 hyperscale booking 70 MW (14,217 sqm). Inner Mongolia national hub. Wind-heavy Eastern Data, Western Compute. Distinct from Huawei Horinger already in the index.

Operator site