Under construction
Colocation
Liquid cooling
Tier III

GDS Taicang Campus

GDS · Taicang

Planned IT
20 MW
Free to lease
20 MW
$ / kW·mo
$79
White space
100k ft²

Inventory

0% occupied

Power

20 MWlive

20 MW to lease · 0 MW in use

White space

100k ft²total

100k ft² free · — occupied

9,290 m² · 9,290 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease20 MW
Utility feed—
Campus / planned20 MW

Power cost

$79/kW·mo

8.5¢ industrial · 10.9¢ after PUE 1.28

Per MW·year
$953k
This site · 20 MW
$19M/yr
15 kW rack
$1,191/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

Jiangsu industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
40%
Rack density
15 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Jiangsu. Dual 110 kV. Yangtze Delta industrial tariff.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Taicang, Jiangsu, China

Taicang, Suzhou, Jiangsu

31.458°, 121.128° · Asia

Tenants / users

Hyperscale, cloud, AI training — Eastern Data, Western Compute

Notes

Taicang new build. 1Q26 booking 20 MW, 2Q26 follow-on 16 MW. Shanghai-adjacent Jiangsu growth market paired with Changshu. Not live capacity.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.