GDS Taicang Campus
GDS · Taicang
- Planned IT
- 20 MW
- Free to lease
- 20 MW
- $ / kW·mo
- $79
- White space
- 100k ft²
Inventory
0% occupiedPower
20 MWlive
20 MW to lease · 0 MW in use
White space
100k ft²total
100k ft² free · — occupied
9,290 m² · 9,290 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$79/kW·mo
8.5¢ industrial · 10.9¢ after PUE 1.28
- Per MW·year
- $953k
- This site · 20 MW
- $19M/yr
- 15 kW rack
- $1,191/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.
Jiangsu industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 40%
- Rack density
- 15 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- State Grid Jiangsu. Dual 110 kV. Yangtze Delta industrial tariff.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Taicang, Jiangsu, China
Taicang, Suzhou, Jiangsu
31.458°, 121.128° · Asia
Tenants / users
Hyperscale, cloud, AI training — Eastern Data, Western Compute
Notes
Taicang new build. 1Q26 booking 20 MW, 2Q26 follow-on 16 MW. Shanghai-adjacent Jiangsu growth market paired with Changshu. Not live capacity.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.