GDS Shaoguan Computing Cluster
GDS · Shaoguan Qujiang
- Planned IT
- 200 MW
- Free to lease
- 200 MW
- $ / kW·mo
- $72
- White space
- 962k ft²
Inventory
0% occupiedPower
200 MWlive
200 MW to lease · 0 MW in use
White space
962k ft²total
962k ft² free · — occupied
89k m² · 89k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$72/kW·mo
8.2¢ industrial · 9.8¢ after PUE 1.20
- Per MW·year
- $862k
- This site · 200 MW
- $172M/yr
- 16 kW rack
- $1,149/mo
2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $105M/yr less.
Shaoguan industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 45%
- Rack density
- 16 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- China Southern Grid 220 kV campus substation. Dual inlets plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Shaoguan, Guangdong, China
Zhenxing North Road, Baitu Town, Qujiang District, Shaoguan
24.682°, 113.598° · Asia
Tenants / users
Hyperscale, cloud, AI training — Eastern Data, Western Compute
Notes
Shaoguan national hub, Greater Bay west node. 2Q26 booking 83 MW; Phase II filing 200 MW IT at 14-18 kW/rack with a 220 kV campus substation. 96,967 sqm land, two halls plus 220 kV building. Not a Shenzhen metro site.