Expanding
Colocation
Liquid cooling
Tier III

GDS Nantong Campus

GDS · Nantong

IT live
12 MW
Free to lease
0.8 MW
$ / kW·mo
$79
White space
142k ft²

Inventory

93% occupied

Power

12 MWlive

0.8 MW to lease · 11.2 MW in use

White space

142k ft²total

4,773 ft² free · 137k ft² occupied

13k m² · 443 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease0.8 MW
Utility feed25 MW
Campus / planned20 MW

About 13 MW of the utility feed is cooling, conversion, and house load.

Power cost

$79/kW·mo

8.5¢ industrial · 10.9¢ after PUE 1.28

Per MW·year
$953k
This site · 12 MW
$11M/yr
12 kW rack
$953/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.1M/yr less.

Jiangsu industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
40%
Rack density
12 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Jiangsu. Dual 110 kV. Yangtze Delta industrial tariff.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Nantong, Jiangsu, China

Nantong, Jiangsu

32.016°, 120.865° · Asia

Tenants / users

Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China

Notes

Nantong. North-bank Yangtze satellite. IDC license city for GDS Suzhou. Established-market DR, not a western-compute cluster.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.