Under construction
Colocation
Liquid cooling
Tier III

GDS Guangzhou GZ4

GDS · Guangzhou GZ4

Planned IT
14 MW
Free to lease
14 MW
$ / kW·mo
$83
White space
80k ft²

Inventory

0% occupied

Power

14 MWlive

14 MW to lease · 0 MW in use

White space

80k ft²total

80k ft² free · — occupied

7,390 m² · 7,390 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease14 MW
Utility feed—
Campus / planned14 MW

Power cost

$83/kW·mo

8.9¢ industrial · 11.4¢ after PUE 1.28

Per MW·year
$998k
This site · 14 MW
$14M/yr
12 kW rack
$998/mo
3.2¢ cheapdear 22.4¢

2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.9M/yr less.

Guangzhou industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
35%
Rack density
12 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
China Southern Grid. Dual municipal feeds plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Guangzhou, Guangdong, China

Guangzhou, Guangdong

23.108°, 113.412° · Asia

Tenants / users

Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China

Notes

GZ4 converted hall under construction. Pre-commitment tracked from 2025. Completes the Guangzhou set with GZ1, GZ3 and Nansha.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.