GDS Guangzhou GZ4
GDS · Guangzhou GZ4
- Planned IT
- 14 MW
- Free to lease
- 14 MW
- $ / kW·mo
- $83
- White space
- 80k ft²
Inventory
0% occupiedPower
14 MWlive
14 MW to lease · 0 MW in use
White space
80k ft²total
80k ft² free · — occupied
7,390 m² · 7,390 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$83/kW·mo
8.9¢ industrial · 11.4¢ after PUE 1.28
- Per MW·year
- $998k
- This site · 14 MW
- $14M/yr
- 12 kW rack
- $998/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.9M/yr less.
Guangzhou industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 35%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- China Southern Grid. Dual municipal feeds plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Guangzhou, Guangdong, China
Guangzhou, Guangdong
23.108°, 113.412° · Asia
Tenants / users
Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China
Notes
GZ4 converted hall under construction. Pre-commitment tracked from 2025. Completes the Guangzhou set with GZ1, GZ3 and Nansha.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.