Operational
Colocation
Liquid cooling
Tier III

GDS Guangzhou GZ1

GDS · Guangzhou GZ1

IT live
12 MW
Free to lease
0.8 MW
$ / kW·mo
$83
White space
94k ft²

Inventory

93% occupied

Power

12 MWlive

0.8 MW to lease · 11.2 MW in use

White space

94k ft²total

5,250 ft² free · 89k ft² occupied

8,710 m² · 488 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease0.8 MW
Utility feed15 MW
Campus / planned12 MW

About 3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$83/kW·mo

8.9¢ industrial · 11.4¢ after PUE 1.28

Per MW·year
$998k
This site · 12 MW
$12M/yr
10 kW rack
$832/mo
3.2¢ cheapdear 22.4¢

2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.7M/yr less.

Guangzhou industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
30%
Rack density
10 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
China Southern Grid. Dual municipal feeds plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Guangzhou, Guangdong, China

Guangzhou, Guangdong

23.128°, 113.335° · Asia

Tenants / users

Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China

Notes

GZ1 converted 1H16. Original Guangzhou hall. Complements the generic Guangzhou campus already in the index.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.