Expanding
Colocation
Liquid cooling
Tier III

GDS Chongqing CQ1

GDS · Chongqing CQ1

IT live
8 MW
Free to lease
0.6 MW
$ / kW·mo
$80
White space
142k ft²

Inventory

93% occupied

Power

8 MWlive

0.6 MW to lease · 7.4 MW in use

White space

142k ft²total

3,182 ft² free · 139k ft² occupied

13k m² · 296 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease0.6 MW
Utility feed25 MW
Campus / planned20 MW

About 17 MW of the utility feed is cooling, conversion, and house load.

Power cost

$80/kW·mo

8.6¢ industrial · 11¢ after PUE 1.28

Per MW·year
$964k
This site · 8 MW
$7.7M/yr
12 kW rack
$964/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.8M/yr less.

Chongqing industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
45%
Rack density
12 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
State Grid Chongqing. Dual municipal feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Chongqing, Chongqing, China

Liangjiang New Area, Chongqing

29.618°, 106.512° · Asia

Tenants / users

Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China

Notes

CQ1 purpose-built, owned. Chengdu/Chongqing hub. Phase 2 still in the 2025-and-beyond pipeline. Pair to Chengdu Pidu.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.