GDS Chongqing CQ1
GDS · Chongqing CQ1
- IT live
- 8 MW
- Free to lease
- 0.6 MW
- $ / kW·mo
- $80
- White space
- 142k ft²
Inventory
93% occupiedPower
8 MWlive
0.6 MW to lease · 7.4 MW in use
White space
142k ft²total
3,182 ft² free · 139k ft² occupied
13k m² · 296 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 17 MW of the utility feed is cooling, conversion, and house load.
Power cost
$80/kW·mo
8.6¢ industrial · 11¢ after PUE 1.28
- Per MW·year
- $964k
- This site · 8 MW
- $7.7M/yr
- 12 kW rack
- $964/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.8M/yr less.
Chongqing industrial 35 kV+ · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 45%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- State Grid Chongqing. Dual municipal feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Chongqing, Chongqing, China
Liangjiang New Area, Chongqing
29.618°, 106.512° · Asia
Tenants / users
Hyperscale, cloud, enterprise — Alibaba, Tencent, AWS China, Azure China
Notes
CQ1 purpose-built, owned. Chengdu/Chongqing hub. Phase 2 still in the 2025-and-beyond pipeline. Pair to Chengdu Pidu.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.