Yandex Vladimir AZ-2
Yandex · Vladimir
- Planned IT
- 40 MW
- Remaining
- 40 MW
- $ / kW·mo
- $37
- White space
- 143k ft²
Inventory
0% occupiedPower
40 MWcampus
40 MW pipeline · 0 MW in use
White space
143k ft²total
143k ft² free · — occupied
13k m² · 13k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$37/kW·mo
4.6¢ industrial · 5.1¢ after PUE 1.10
- Per MW·year
- $443k
- This site · 40 MW
- $18M/yr
- 25 kW rack
- $923/mo
1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.4M/yr less.
Vladimirenergo · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 25%
- Rack density
- 25 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Vladimirenergo / Rosseti. Dual feeds. Mixed gas and nuclear; free-air most of the year.
Cooling
Plant
Free air
Liquid
Deployed
Rack density
25 kW
H100-eq
4k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Year-round free-air, PUE 1.1. Direct-to-chip on AI halls. 25.6 Tbps to the adjacent AZ.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Vladimir, Vladimir Oblast, Russia
Vladimir, next to existing Yandex campus
56.131°, 40.412° · Europe
Tenants / users
Yandex Cloud AI
Notes
Sixth Yandex hall, new AZ in 2026. 40 MW+, less than 1 ms to the existing Vladimir zone. Domestic AI training/inference.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.