Under construction
Hyperscale
Liquid cooling
Tier III

Yandex Vladimir AZ-2

Yandex · Vladimir

Planned IT
40 MW
Remaining
40 MW
$ / kW·mo
$37
White space
143k ft²

Inventory

0% occupied

Power

40 MWcampus

40 MW pipeline · 0 MW in use

White space

143k ft²total

143k ft² free · occupied

13k m² · 13k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining40 MW
Utility feed
Campus / planned40 MW

Power cost

$37/kW·mo

4.6¢ industrial · 5.1¢ after PUE 1.10

Per MW·year
$443k
This site · 40 MW
$18M/yr
25 kW rack
$923/mo
3.2¢ cheapdear 22.4¢

1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.4M/yr less.

Vladimirenergo · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
25%
Rack density
25 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Vladimirenergo / Rosseti. Dual feeds. Mixed gas and nuclear; free-air most of the year.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

25 kW

H100-eq

4k

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Year-round free-air, PUE 1.1. Direct-to-chip on AI halls. 25.6 Tbps to the adjacent AZ.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Vladimir, Vladimir Oblast, Russia

Vladimir, next to existing Yandex campus

56.131°, 40.412° · Europe

Tenants / users

Yandex Cloud AI

Notes

Sixth Yandex hall, new AZ in 2026. 40 MW+, less than 1 ms to the existing Vladimir zone. Domestic AI training/inference.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.