Operational
Hyperscale
Air cooled
Tier III

Yandex Vladimir

Yandex · Vladimir

IT live
48 MW
Remaining
0 MW
$ / kW·mo
$39
White space
300k ft²

Inventory

100% occupied

Power

48 MWcampus

0 MW to commission · 48 MW in use

White space

300k ft²total

free · 300k ft² occupied

28k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live48 MW
Remaining0 MW
Utility feed60 MW
Campus / planned48 MW

About 12 MW of the utility feed is cooling, conversion, and house load.

Power cost

$39/kW·mo

4.6¢ industrial · 5.3¢ after PUE 1.15

Per MW·year
$463k
This site · 48 MW
$22M/yr
15 kW rack
$579/mo
3.2¢ cheapdear 22.4¢

1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.8M/yr less.

Vladimirenergo · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2015
Renewable match
25%
Rack density
15 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Vladimirenergo / Rosseti. Dual feeds. Mixed gas and nuclear; free-air most of the year.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cold-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Vladimir, Vladimir Oblast, Russia

Vladimir, Vladimir Oblast

56.129°, 40.407° · Europe

Tenants / users

Yandex Cloud, Search, Ads

Notes

Yandex's existing Vladimir campus. One of five live Yandex halls (Vladimir, Sasovo, Ivanteevka, Mytishchi, Kaluga). Domestic cloud, not a US hyperscaler.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.