Westbank M3 Mount Pleasant
Westbank / TELUS · M3 / East 5th
- Planned IT
- 12 MW
- Free to lease
- 12 MW
- $ / kW·mo
- $64
- White space
- 50k ft²
Inventory
0% occupiedPower
12 MWlive
12 MW to lease · 0 MW in use
White space
50k ft²total
50k ft² free · — occupied
4,645 m² · 4,645 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$64/kW·mo
6.8¢ industrial · 8.7¢ after PUE 1.28
- Per MW·year
- $762k
- This site · 12 MW
- $9.1M/yr
- 20 kW rack
- $1,271/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.8M/yr less.
BC Hydro · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 96%
- Rack density
- 20 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- BC Hydro. Dual feeds plus on-site diesel. Hydro-heavy British Columbia grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Vancouver, British Columbia, Canada
111 East 5th Avenue, Vancouver, BC
49.267°, -123.101° · North America
Tenants / users
TELUS sovereign AI, Vancouver inference
Notes
1977 office (ex-Hootsuite) converting to a data hall. Opens end-2026, scales through 2028. Second Vancouver leg of the TELUS BC AI cluster with 150 West Georgia.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.