VITRO Santa Rosa

VITRO (ePLDT) · Santa Rosa

IT live
36 MW
Free to lease
6.5 MW
$ / kW·mo
$119
White space
355k ft²

Inventory

82% occupied

Power

36 MWlive

6.5 MW to lease · 29.5 MW in use

White space

355k ft²total

37k ft² free · 318k ft² occupied

33k m² · 3,421 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live36 MW
Free to lease6.5 MW
Utility feed62.5 MW
Campus / planned50 MW

About 26.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$119/kW·mo

11.8¢ industrial · 16.3¢ after PUE 1.38

Per MW·year
$1.4M
This site · 36 MW
$51M/yr
12 kW rack
$1,426/mo
3.2¢ cheapdear 22.4¢

3.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $37M/yr less.

Meralco south · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
20%
Rack density
12 kW
Voltage
PUE
1.381.00 ideal · 1.60 typical
Power source
Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Santa Rosa, Laguna, Philippines

Santa Rosa, Laguna

14.294°, 121.089° · Asia

Tenants / users

Hyperscale, cloud, enterprise, PLDT on-net

Notes

Largest live DC in the Philippines. Five-hectare PLDT campus, 18 halls, 36 MW IT, 60 MW substation. First of a 100 MW VITRO series.