VITRO Pasig
VITRO (ePLDT) · Pasig
- IT live
- 7.5 MW
- Free to lease
- 1.4 MW
- $ / kW·mo
- $123
- White space
- 73k ft²
Inventory
82% occupiedPower
7.5 MWlive
1.4 MW to lease · 6.2 MW in use
White space
73k ft²total
11k ft² free · 63k ft² occupied
6,823 m² · 980 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1.9 MW of the utility feed is cooling, conversion, and house load.
Power cost
$123/kW·mo
12.2¢ industrial · 16.8¢ after PUE 1.38
- Per MW·year
- $1.5M
- This site · 7.5 MW
- $11M/yr
- 6 kW rack
- $737/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.2M/yr less.
Meralco · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2000
- Renewable match
- 20%
- Rack density
- 6 kW
- PUE
- 1.381.00 ideal · 1.60 typical
- Power source
- Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH. Tropical wet-bulb limits evaporative; liquid-ready high-density cages on newer halls.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Pasig, Metro Manila, Philippines
Canley Road corner C.P. Garcia Ave, Pasig
14.577°, 121.085° · Asia
Tenants / users
Enterprise, finance, government, networks
Notes
Former VITRO flagship. Five-floor purpose-built hall, live since 2000. Metro Manila retail colo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.