Operational
Colocation
Air cooled
Tier III

VITRO Clark

VITRO (ePLDT) · Clark

IT live
8 MW
Free to lease
1.4 MW
$ / kW·mo
$117
White space
69k ft²

Inventory

82% occupied

Power

8 MWlive

1.4 MW to lease · 6.6 MW in use

White space

69k ft²total

10k ft² free · 59k ft² occupied

6,452 m² · 929 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease1.4 MW
Utility feed10 MW
Campus / planned8 MW

About 2 MW of the utility feed is cooling, conversion, and house load.

Power cost

$117/kW·mo

11.6¢ industrial · 16¢ after PUE 1.38

Per MW·year
$1.4M
This site · 8 MW
$11M/yr
8 kW rack
$935/mo
3.2¢ cheapdear 22.4¢

3.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.1M/yr less.

NGCP north · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
20%
Rack density
8 kW
PUE
1.381.00 ideal · 1.60 typical
Power source
Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH. Tropical wet-bulb limits evaporative; liquid-ready high-density cages on newer halls.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Angeles, Pampanga, Philippines

Lot 3 Ninoy Aquino Avenue, Clark, Angeles

15.175°, 120.560° · Asia

Tenants / users

Enterprise, government, DR for Metro Manila

Notes

Largest DC outside Metro Manila. Northern Luzon DR plus on-site solar.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.