VITRO General Trias

VITRO (ePLDT) · Cavite

Planned IT
100 MW
Free to lease
100 MW
$ / kW·mo
$112
White space
357k ft²

Inventory

0% occupied

Power

100 MWlive

100 MW to lease · 0 MW in use

White space

357k ft²total

357k ft² free · occupied

33k m² · 33k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease100 MW
Utility feed
Campus / planned100 MW

Power cost

$112/kW·mo

12¢ industrial · 15.4¢ after PUE 1.28

Per MW·year
$1.3M
This site · 100 MW
$135M/yr
25 kW rack
$2,803/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $99M/yr less.

Meralco / NGCP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
20%
Rack density
25 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

General Trias, Cavite, Philippines

MPIC property, General Trias, Cavite

14.386°, 120.881° · Asia

Tenants / users

Hyperscale, AI, cloud

Notes

Twelfth VITRO hall. Five prefab modules, 100 MW, targeted 2028 pending occupancy at Santa Rosa and a storm-risk study. Would be the country's largest.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.