VITRO General Trias
VITRO (ePLDT) · Cavite
- Planned IT
- 100 MW
- Free to lease
- 100 MW
- $ / kW·mo
- $112
- White space
- 357k ft²
Inventory
0% occupiedPower
100 MWlive
100 MW to lease · 0 MW in use
White space
357k ft²total
357k ft² free · — occupied
33k m² · 33k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$112/kW·mo
12¢ industrial · 15.4¢ after PUE 1.28
- Per MW·year
- $1.3M
- This site · 100 MW
- $135M/yr
- 25 kW rack
- $2,803/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $99M/yr less.
Meralco / NGCP · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 20%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
General Trias, Cavite, Philippines
MPIC property, General Trias, Cavite
14.386°, 120.881° · Asia
Tenants / users
Hyperscale, AI, cloud
Notes
Twelfth VITRO hall. Five prefab modules, 100 MW, targeted 2028 pending occupancy at Santa Rosa and a storm-risk study. Would be the country's largest.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.