Under construction
Colocation
Liquid cooling
Tier III

Viettel An Khanh

Viettel IDC · An Khanh

Planned IT
60 MW
Free to lease
60 MW
$ / kW·mo
$83
White space
250k ft²

Inventory

0% occupied

Power

60 MWlive

60 MW to lease · 0 MW in use

White space

250k ft²total

250k ft² free · occupied

23k m² · 23k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease60 MW
Utility feed
Campus / planned60 MW

Power cost

$83/kW·mo

8.4¢ industrial · 11.3¢ after PUE 1.35

Per MW·year
$993k
This site · 60 MW
$60M/yr
20 kW rack
$1,656/mo
3.2¢ cheapdear 22.4¢

2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $37M/yr less.

EVN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
25%
Rack density
20 kW
PUE
1.351.00 ideal · 1.60 typical
Power source
EVN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

HPC rooms to 60 kW/rack. Direct-to-chip ready. PUE at or below 1.4.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hanoi, Hanoi, Vietnam

An Khanh, Hoai Duc, Hanoi

21.001°, 105.729° · Asia

Tenants / users

Government, defence, AI, enterprise

Notes

Broke ground Aug 2025. 60 MW, 2,400 racks, 1.9 ha. Phase 1 Q2 2026. Northern half of Viettel's hyperscale pair with Tan Phu Trung.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.