Viettel An Khanh
Viettel IDC · An Khanh
- Planned IT
- 60 MW
- Free to lease
- 60 MW
- $ / kW·mo
- $83
- White space
- 250k ft²
Inventory
0% occupiedPower
60 MWlive
60 MW to lease · 0 MW in use
White space
250k ft²total
250k ft² free · — occupied
23k m² · 23k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$83/kW·mo
8.4¢ industrial · 11.3¢ after PUE 1.35
- Per MW·year
- $993k
- This site · 60 MW
- $60M/yr
- 20 kW rack
- $1,656/mo
2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $37M/yr less.
EVN · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 25%
- Rack density
- 20 kW
- PUE
- 1.351.00 ideal · 1.60 typical
- Power source
- EVN. Dual municipal feeds plus on-site generators.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
HPC rooms to 60 kW/rack. Direct-to-chip ready. PUE at or below 1.4.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Hanoi, Hanoi, Vietnam
An Khanh, Hoai Duc, Hanoi
21.001°, 105.729° · Asia
Tenants / users
Government, defence, AI, enterprise
Notes
Broke ground Aug 2025. 60 MW, 2,400 racks, 1.9 ha. Phase 1 Q2 2026. Northern half of Viettel's hyperscale pair with Tan Phu Trung.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.