Vantage Santa Clara II
Vantage Data Centers · CA2

- IT live
- 36 MW
- Free to lease
- 4.3 MW
- $ / kW·mo
- $86
- White space
- 293k ft²
Inventory
88% occupiedPower
36 MWlive
4.3 MW to lease · 31.7 MW in use
White space
293k ft²total
14k ft² free · 280k ft² occupied
27k m² · 1,254 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 57.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$86/kW·mo
9.4¢ industrial · 11.8¢ after PUE 1.25
- Per MW·year
- $1M
- This site · 36 MW
- $37M/yr
- 30 kW rack
- $2,573/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $24M/yr less.
Silicon Valley Power · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2024
- Renewable match
- 70%
- Rack density
- 30 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- Silicon Valley Power. Dual campus substations. Municipal utility, not PG and E.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Santa Clara, California, United States
737 Mathew Street, Santa Clara, CA
37.369°, -121.959° · North America
Tenants / users
Hyperscale, cloud, AI
Notes
Nine-acre second Santa Clara campus, less than two miles from CA1. Three multi-story halls toward 75 MW. Combined Silicon Valley Vantage hub about 152 MW.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.