Vantage Santa Clara I
Vantage Data Centers · CA1

- IT live
- 77 MW
- Free to lease
- 9.2 MW
- $ / kW·mo
- $84
- White space
- 376k ft²
Inventory
88% occupiedPower
77 MWlive
9.2 MW to lease · 67.8 MW in use
White space
376k ft²total
36k ft² free · 340k ft² occupied
35k m² · 3,353 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 19.3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$84/kW·mo
9.4¢ industrial · 11.5¢ after PUE 1.22
- Per MW·year
- $1M
- This site · 77 MW
- $77M/yr
- 22 kW rack
- $1,842/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $51M/yr less.
Silicon Valley Power · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2011
- Renewable match
- 70%
- Rack density
- 22 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- Silicon Valley Power. Dual campus substations. Municipal utility, not PG and E.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
22 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Santa Clara, California, United States
2820 Northwestern Parkway, Santa Clara, CA
37.388°, -121.978° · North America
Tenants / users
Hyperscale, cloud, enterprise
Notes
Largest LEED Platinum campus in North America. Six halls, 21 acres, three 50 MW substations on Silicon Valley Power. Complements Equinix SV. Distinct from Frontier Texas already in the index.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.