Expanding
Colocation
Liquid cooling
Tier III

Vantage Quincy

Vantage Data Centers · WA1

Vantage Quincy facility
Vantage Data Centers · Source
IT live
64 MW
Free to lease
7.7 MW
$ / kW·mo
$41
White space
435k ft²

Inventory

88% occupied

Power

64 MWlive

7.7 MW to lease · 56.3 MW in use

White space

435k ft²total

30k ft² free · 405k ft² occupied

40k m² · 2,787 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live64 MW
Free to lease7.7 MW
Utility feed111 MW
Campus / planned89 MW

About 47.3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$41/kW·mo

4.8¢ industrial · 5.7¢ after PUE 1.18

Per MW·year
$496k
This site · 64 MW
$32M/yr
22 kW rack
$910/mo
3.2¢ cheapdear 22.4¢

1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

Grant PUD hydro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2014
Renewable match
90%
Rack density
22 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Grant PUD / BPA. Dual 115 kV. Columbia Basin hydro.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

22 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Quincy, Washington, United States

2101 M Street Northeast, Quincy, WA

47.234°, -119.853° · North America

Tenants / users

Hyperscale, cloud

Notes

68-acre Columbia Basin campus. Grant PUD hydro. Washington tax incentives. Distinct from Sabey Quincy on the same plateau.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.