Vantage Quincy
Vantage Data Centers · WA1

- IT live
- 64 MW
- Free to lease
- 7.7 MW
- $ / kW·mo
- $41
- White space
- 435k ft²
Inventory
88% occupiedPower
64 MWlive
7.7 MW to lease · 56.3 MW in use
White space
435k ft²total
30k ft² free · 405k ft² occupied
40k m² · 2,787 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 47.3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$41/kW·mo
4.8¢ industrial · 5.7¢ after PUE 1.18
- Per MW·year
- $496k
- This site · 64 MW
- $32M/yr
- 22 kW rack
- $910/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.
Grant PUD hydro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2014
- Renewable match
- 90%
- Rack density
- 22 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Grant PUD / BPA. Dual 115 kV. Columbia Basin hydro.
Cooling
Plant
Free air
Liquid
Deployed
Rack density
22 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Quincy, Washington, United States
2101 M Street Northeast, Quincy, WA
47.234°, -119.853° · North America
Tenants / users
Hyperscale, cloud
Notes
68-acre Columbia Basin campus. Grant PUD hydro. Washington tax incentives. Distinct from Sabey Quincy on the same plateau.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.