Vantage Québec City Campus
Vantage Data Centers · QC2 / Marie-Curie
- IT live
- 48 MW
- Free to lease
- 6.2 MW
- $ / kW·mo
- $42
- White space
- 514k ft²
Inventory
87% occupiedPower
48 MWlive
6.2 MW to lease · 41.8 MW in use
White space
514k ft²total
30k ft² free · 484k ft² occupied
48k m² · 2,787 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 59 MW of the utility feed is cooling, conversion, and house load.
Power cost
$42/kW·mo
5¢ industrial · 5.8¢ after PUE 1.15
- Per MW·year
- $504k
- This site · 48 MW
- $24M/yr
- 16 kW rack
- $672/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.7M/yr less.
Hydro-Québec Rate L · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 99%
- Rack density
- 16 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Hydro-Québec 120 kV private interconnection plus on-site diesel. Rate L industrial hydro.
Cooling
Plant
Free air
Liquid
Deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Québec, Quebec, Canada
2900 Avenue Marie-Curie, Québec, QC
46.783°, -71.313° · North America
Tenants / users
Hyperscale, cloud, government, Azure Canada East adjacency
Notes
30 acres, four halls, 86 MW / 925,000 sq ft end-state. Former 4Degrees Québec City. Six MMRs. Free-air up to 86 percent of the year. Dual-site with Montréal I/II/III.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.