Vantage Phoenix

Vantage Data Centers · AZ1

Vantage Phoenix facility
Vantage Data Centers · Source
IT live
96 MW
Free to lease
11.5 MW
$ / kW·mo
$75
White space
724k ft²

Inventory

88% occupied

Power

96 MWlive

11.5 MW to lease · 84.5 MW in use

White space

724k ft²total

38k ft² free · 686k ft² occupied

67k m² · 3,521 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live96 MW
Free to lease11.5 MW
Utility feed220 MW
Campus / planned176 MW

About 124 MW of the utility feed is cooling, conversion, and house load.

Power cost

$75/kW·mo

8.2¢ industrial · 10.3¢ after PUE 1.25

Per MW·year
$898k
This site · 96 MW
$86M/yr
28 kW rack
$2,095/mo
3.2¢ cheapdear 22.4¢

2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $53M/yr less.

APS Goodyear · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
45%
Rack density
28 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
APS / SRP. Dual 69 kV inlets. Desert dry-cooler campus.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

28 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Closed-loop dry coolers / adiabatic. Water-light desert or zero-WUE design.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Goodyear, Arizona, United States

45 South Bullard Avenue, Goodyear, AZ

33.449°, -112.358° · North America

Tenants / users

Hyperscale, cloud

Notes

Goodyear West Valley campus. Multi-building toward 176 MW. Desert wholesale next to Aligned PHX and CyrusOne Chandler.

Operator site