Operational
Colocation
Liquid cooling
Tier III

Vantage Newport Campus

Vantage Data Centers · Newport

IT live
72 MW
Free to lease
7.2 MW
$ / kW·mo
$155
White space
300k ft²

Inventory

90% occupied

Power

72 MWlive

7.2 MW to lease · 64.8 MW in use

White space

300k ft²total

30k ft² free · 270k ft² occupied

28k m² · 2,787 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live72 MW
Free to lease7.2 MW
Utility feed150 MW
Campus / planned120 MW

About 78 MW of the utility feed is cooling, conversion, and house load.

Power cost

$155/kW·mo

17.4¢ industrial · 21.2¢ after PUE 1.22

Per MW·year
$1.9M
This site · 72 MW
$134M/yr
20 kW rack
$3,099/mo
3.2¢ cheapdear 22.4¢

5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $109M/yr less.

NGED South Wales · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2010
Renewable match
70%
Rack density
20 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
National Grid Wales / NGED. Former Next Generation Data campus.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Newport, Wales, United Kingdom

Imperial Park, Newport, Wales

51.584°, -2.998° · Europe

Tenants / users

Hyperscale, cloud, enterprise

Notes

Former NGD — one of the UK's largest single campuses. Vantage-owned wholesale in south Wales.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.