Vantage Newport Campus
Vantage Data Centers · Newport
- IT live
- 72 MW
- Free to lease
- 7.2 MW
- $ / kW·mo
- $155
- White space
- 300k ft²
Inventory
90% occupiedPower
72 MWlive
7.2 MW to lease · 64.8 MW in use
White space
300k ft²total
30k ft² free · 270k ft² occupied
28k m² · 2,787 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 78 MW of the utility feed is cooling, conversion, and house load.
Power cost
$155/kW·mo
17.4¢ industrial · 21.2¢ after PUE 1.22
- Per MW·year
- $1.9M
- This site · 72 MW
- $134M/yr
- 20 kW rack
- $3,099/mo
5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $109M/yr less.
NGED South Wales · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2010
- Renewable match
- 70%
- Rack density
- 20 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- National Grid Wales / NGED. Former Next Generation Data campus.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Newport, Wales, United Kingdom
Imperial Park, Newport, Wales
51.584°, -2.998° · Europe
Tenants / users
Hyperscale, cloud, enterprise
Notes
Former NGD — one of the UK's largest single campuses. Vantage-owned wholesale in south Wales.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.