Vantage Montréal III QC61
Vantage Data Centers · Montréal III / Baie-D'Urfé
- IT live
- 30 MW
- Free to lease
- 3.9 MW
- $ / kW·mo
- $41
- White space
- 201k ft²
Inventory
87% occupiedPower
30 MWlive
3.9 MW to lease · 26.1 MW in use
White space
201k ft²total
17k ft² free · 183k ft² occupied
19k m² · 1,618 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 15 MW of the utility feed is cooling, conversion, and house load.
Power cost
$41/kW·mo
4.9¢ industrial · 5.7¢ after PUE 1.16
- Per MW·year
- $498k
- This site · 30 MW
- $15M/yr
- 18 kW rack
- $747/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.2M/yr less.
Hydro-Québec Rate L / West Island · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 99%
- Rack density
- 18 kW
- PUE
- 1.161.00 ideal · 1.60 typical
- Power source
- Hydro-Québec dedicated 45 MW substation, private interconnection. Rate L.
Cooling
Plant
Closed-loop liquid
Liquid
Deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop chillers plus air-side economizers. Outside-air economization up to 80 percent of the year.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Baie-D'Urfé, Quebec, Canada
21525 Clark Graham Avenue, Baie-D'Urfé, QC
45.414°, -73.912° · North America
Tenants / users
Hyperscale, cloud
Notes
8 acres, one building, two modules, 30 MW IT. Delivered all phases December 2025. Third Montréal Vantage campus; city total 89 MW live toward a 178 MW Québec book with Québec City.