Vantage Montréal II QC4
Vantage Data Centers · Montréal II / Hypertec
- IT live
- 36 MW
- Free to lease
- 4.7 MW
- $ / kW·mo
- $44
- White space
- 300k ft²
Inventory
87% occupiedPower
36 MWlive
4.7 MW to lease · 31.3 MW in use
White space
300k ft²total
23k ft² free · 278k ft² occupied
28k m² · 2,090 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 26.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$44/kW·mo
5¢ industrial · 6¢ after PUE 1.20
- Per MW·year
- $526k
- This site · 36 MW
- $19M/yr
- 16 kW rack
- $701/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.8M/yr less.
Hydro-Québec Rate L · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 99%
- Rack density
- 16 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Hydro-Québec 120 kV private interconnection plus on-site diesel. Rate L industrial hydro.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Montréal, Quebec, Canada
2800 Trans-Canada Highway, Montréal, QC
45.462°, -73.811° · North America
Tenants / users
Hyperscale, cloud
Notes
Former Hypertec campus, acquired 2020. 10 acres, three buildings, 50 MW / 320,000 sq ft end-state. Dedicated 120 kV substation, two 25 kV feeders. Geothermal assist.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.