Under construction
Colocation
Air cooled
Tier III

Vantage Milan MXP2

Vantage Data Centers · MXP2 Castelletto

Vantage Milan MXP2 facility
Vantage Data Centers · Source
Planned IT
32 MW
Free to lease
32 MW
$ / kW·mo
$174
White space
222k ft²

Inventory

0% occupied

Power

32 MWlive

32 MW to lease · 0 MW in use

White space

222k ft²total

222k ft² free · occupied

21k m² · 21k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease32 MW
Utility feed
Campus / planned32 MW

Power cost

$174/kW·mo

18.6¢ industrial · 23.8¢ after PUE 1.28

Per MW·year
$2.1M
This site · 32 MW
$67M/yr
8 kW rack
$1,390/mo
3.2¢ cheapdear 22.4¢

5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $55M/yr less.

Italy industrial / Milan · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
50%
Rack density
8 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Duereti / Terna. Dual feeds plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Closed-loop chilled water with air-side economizers. No evaporative towers.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Castelletto, Lombardy, Italy

Castelletto, 15 km from central Milan

45.438°, 8.958° · Europe

Tenants / users

Cloud, enterprise, wholesale

Notes

Second Vantage Milan campus. Two three-story halls, 32 MW, ~10,000 sqm. First phase targeted spring 2026. 8 kW/rack CRAH design.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.