Vantage Milan MXP2
Vantage Data Centers · MXP2 Castelletto

- Planned IT
- 32 MW
- Free to lease
- 32 MW
- $ / kW·mo
- $174
- White space
- 222k ft²
Inventory
0% occupiedPower
32 MWlive
32 MW to lease · 0 MW in use
White space
222k ft²total
222k ft² free · — occupied
21k m² · 21k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$174/kW·mo
18.6¢ industrial · 23.8¢ after PUE 1.28
- Per MW·year
- $2.1M
- This site · 32 MW
- $67M/yr
- 8 kW rack
- $1,390/mo
5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $55M/yr less.
Italy industrial / Milan · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 50%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Duereti / Terna. Dual feeds plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop chilled water with air-side economizers. No evaporative towers.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Castelletto, Lombardy, Italy
Castelletto, 15 km from central Milan
45.438°, 8.958° · Europe
Tenants / users
Cloud, enterprise, wholesale
Notes
Second Vantage Milan campus. Two three-story halls, 32 MW, ~10,000 sqm. First phase targeted spring 2026. 8 kW/rack CRAH design.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.