Vantage Milan MXP1
Vantage Data Centers · MXP1 Melegnano
- IT live
- 48 MW
- Free to lease
- 4.8 MW
- $ / kW·mo
- $174
- White space
- 455k ft²
Inventory
90% occupiedPower
48 MWlive
4.8 MW to lease · 43.2 MW in use
White space
455k ft²total
27k ft² free · 427k ft² occupied
42k m² · 2,534 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 32 MW of the utility feed is cooling, conversion, and house load.
Power cost
$174/kW·mo
18.6¢ industrial · 23.8¢ after PUE 1.28
- Per MW·year
- $2.1M
- This site · 48 MW
- $100M/yr
- 12 kW rack
- $2,086/mo
5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $83M/yr less.
Italy industrial / Milan · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 50%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Terna 220 kV campus substation. Enel / Duereti dual feeds plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop chilled water with air-side economizers. No evaporative towers.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Melegnano, Lombardy, Italy
Melegnano, Greater Milan
45.358°, 9.324° · Europe
Tenants / users
Hyperscale, cloud
Notes
30-acre four-building campus. 64 MW critical IT, 517k sqft, on-campus 220 kV substation. Closed-loop chillers with economizers. First Vantage Italy campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.