Under construction
Colocation
Liquid cooling

Vantage Lighthouse (Stargate Wisconsin)

Vantage Data Centers · Lighthouse

Planned IT
—
Free to lease
—
$ / kW·mo
$80
White space
—

Power

IT live—
Free to lease—
Utility feed—
Campus / planned—

Power cost

$80/kW·mo

8.4¢ industrial · 10.9¢ after PUE —

Per MW·year
$957k
This site
—
3.2¢ cheapdear 22.4¢

2.6× the cheapest market (Iceland Landsvirkjun).

Wisconsin industrial · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
100%
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
We Energies. Vantage enabling new zero-emission capacity; 100% matched zero-emission energy (Vantage).

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Closed-loop liquid cooling system using minimal water (Vantage).

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Port Washington, Wisconsin, United States

Port Washington, Ozaukee County, WI

43.389°, -87.869° · North America

Tenants / users

Oracle, OpenAI (Stargate)

Notes

Four data centers providing close to 1 GW of AI capacity; completion scheduled 2028; investment 15B+ USD (Vantage, Oct 22 2025). Planned MW left blank because only an approximate figure was published. Coordinates: OSM relation 252014 (place centroid, approximate). Source: https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.