Vantage KIX1 / OSA1 Osaka
Vantage Data Centers · KIX1 Ibaraki

- Planned IT
- 68 MW
- Free to lease
- 54.4 MW
- $ / kW·mo
- $148
- White space
- 170k ft²
Inventory
20% occupiedPower
68 MWlive
54.4 MW to lease · 13.6 MW in use
White space
170k ft²total
136k ft² free · 34k ft² occupied
16k m² · 13k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$148/kW·mo
17.2¢ industrial · 20.3¢ after PUE 1.18
- Per MW·year
- $1.8M
- This site · 68 MW
- $121M/yr
- 40 kW rack
- $5,926/mo
5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $98M/yr less.
Japan industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2027
- Renewable match
- 50%
- Rack density
- 40 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Kansai Electric (KEPCO). Dual feeds. Seismically isolated building.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ibaraki, Osaka, Japan
Ibaraki, Osaka
34.820°, 135.575° · Asia
Tenants / users
Hyperscale, AI
Notes
68 MW Vantage Osaka campus (KIX1 / OSA1). AI-ready wholesale.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.