Vantage Ashburn I
Vantage Data Centers · VA1

- IT live
- 146 MW
- Free to lease
- 17.5 MW
- $ / kW·mo
- $67
- White space
- 805k ft²
Inventory
88% occupiedPower
146 MWlive
17.5 MW to lease · 128 MW in use
White space
805k ft²total
55k ft² free · 750k ft² occupied
75k m² · 5,086 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 112 MW of the utility feed is cooling, conversion, and house load.
Power cost
$67/kW·mo
7.3¢ industrial · 9.1¢ after PUE 1.25
- Per MW·year
- $799k
- This site · 146 MW
- $117M/yr
- 30 kW rack
- $1,998/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $66M/yr less.
Northern Virginia / Dominion · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2018
- Renewable match
- 50%
- Rack density
- 30 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- Dominion Energy. Dual 34.5 kV inlets plus on-site diesel. Northern Virginia PJM.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ashburn, Virginia, United States
21635 Red Rum Drive, Ashburn, VA
39.044°, -77.487° · North America
Tenants / users
Hyperscale, cloud
Notes
Six-building Northern Virginia campus. 206 MW critical IT. DigitalBridge wholesale, not an IBX. Complements STACK NVA02 and CloudHQ LC.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.