Under construction
Colocation
Liquid cooling
Tier III

Urbacon Toronto DC4

Urbacon Data Centre Solutions · Barker Business Park

Planned IT
36 MW
Free to lease
36 MW
$ / kW·mo
$95
White space
150k ft²

Inventory

0% occupied

Power

36 MWlive

36 MW to lease · 0 MW in use

White space

150k ft²total

150k ft² free · — occupied

14k m² · 14k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease36 MW
Utility feed—
Campus / planned36 MW

Power cost

$95/kW·mo

10.4¢ industrial · 13¢ after PUE 1.25

Per MW·year
$1.1M
This site · 36 MW
$41M/yr
20 kW rack
$1,898/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.

Alectra / IESO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
80%
Rack density
20 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Alectra / Hydro One / IESO. Dual feeds plus on-site diesel. GTA suburban delivery.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Richmond Hill, Ontario, Canada

Barker Business Park, Richmond Hill, ON

43.897°, -79.394° · North America

Tenants / users

Turnkey or colo, fibre at site

Notes

203,000 sq ft, 36 MW critical, 40 MW secured. Permit approved, power energized, civil complete. Part of the C$320 million 2025 green financing. Campus end-state ~150 MW across six halls.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.