Tusass Qinngorput
Tusass · Nuuk
- Planned IT
- 1.5 MW
- Free to lease
- 1.2 MW
- $ / kW·mo
- $77
- White space
- 12k ft²
Inventory
20% occupiedPower
1.5 MWlive
1.2 MW to lease · 0.3 MW in use
White space
12k ft²total
9,375 ft² free · 2,344 ft² occupied
1,089 m² · 871 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$77/kW·mo
9.2¢ industrial · 10.6¢ after PUE 1.15
- Per MW·year
- $927k
- This site · 1.5 MW
- $1.4M/yr
- 6 kW rack
- $463/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $907k/yr less.
Nukissiorfiit · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2027
- Renewable match
- 80%
- Rack density
- 6 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Nukissiorfiit. DKK 155m building + plant. Part of a DKK 1.9bn telecom-security programme.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Tier III free-air. Dual power and cooling paths. About half of 1,200 m² is IT; the rest is cable-landing / telephony plant.
Network carriers
2On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Nuuk, Sermersooq, Greenland
Qinngorput, southeast of Nuuk Airport
64.191°, -51.678° · North America
Tenants / users
Tusass, government, subsea-cable systems
Notes
Greenland's first purpose-built Tier III operations centre. Completes Q1 2027. Tied to a new Faroe–Denmark subsea cable.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.