TTC Teleport DC2

TTC Teleport · TTC

IT live
10 MW
Free to lease
1.4 MW
$ / kW·mo
$121
White space
99k ft²

Inventory

86% occupied

Power

10 MWlive

1.4 MW to lease · 8.6 MW in use

White space

99k ft²total

7,955 ft² free · 91k ft² occupied

9,238 m² · 739 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.4 MW
Utility feed17.5 MW
Campus / planned14 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$121/kW·mo

12.6¢ industrial · 16.6¢ after PUE 1.32

Per MW·year
$1.5M
This site · 10 MW
$15M/yr
12 kW rack
$1,457/mo
3.2¢ cheapdear 22.4¢

3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

CEZ / OTE · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
45%
Rack density
12 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
CEZ / PRE. Dual 22 kV inlets plus on-site diesel. Nuclear plus coal Czech grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Prague, Prague, Czech Republic

Tiskarska, Prague 10

50.070°, 14.513° · Europe

Tenants / users

Cloud, enterprise, networks

Notes

10 MW Prague hall. Largest tracked TTC building. Complements CE Colo for Czech wholesale.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.