Operational
Colocation
Air cooled
Tier III

True IDC Bangkok

True IDC · True IDC

IT live
10 MW
Free to lease
1.8 MW
$ / kW·mo
$98
White space
137k ft²

Inventory

82% occupied

Power

10 MWlive

1.8 MW to lease · 8.2 MW in use

White space

137k ft²total

14k ft² free · 123k ft² occupied

13k m² · 1,306 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.8 MW
Utility feed17.5 MW
Campus / planned14 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$98/kW·mo

10.2¢ industrial · 13.5¢ after PUE 1.32

Per MW·year
$1.2M
This site · 10 MW
$12M/yr
6 kW rack
$590/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.1M/yr less.

EGAT / PEA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
20%
Rack density
6 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
MEA / PEA / EGAT. Dual feeds plus on-site generators.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH. Tropical wet-bulb limits evaporative; liquid-ready high-density cages on newer halls.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Bangkok, Bangkok, Thailand

Bangkok, Thailand

13.743°, 100.562° · Asia

Tenants / users

True, enterprise, content, cloud

Notes

True Corporation colo. On-net to True fiber and CAT/NT. Retail and wholesale cages.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.