Triara Queretaro
Triara (Telmex) · QRO
- IT live
- 28 MW
- Free to lease
- 3.4 MW
- $ / kW·mo
- $89
- White space
- 266k ft²
Inventory
88% occupiedPower
28 MWlive
3.4 MW to lease · 24.6 MW in use
White space
266k ft²total
19k ft² free · 247k ft² occupied
25k m² · 1,774 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 18.9 MW of the utility feed is cooling, conversion, and house load.
Power cost
$89/kW·mo
9.8¢ industrial · 12.3¢ after PUE 1.25
- Per MW·year
- $1.1M
- This site · 28 MW
- $30M/yr
- 12 kW rack
- $1,073/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $20M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2018
- Renewable match
- 30%
- Rack density
- 12 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Queretaro, Queretaro, Mexico
Epigmenio Gonzalez 2, Claustros del Parque, Queretaro
20.612°, -100.393° · North America
Tenants / users
Oracle Cloud, Google Cloud on-ramp, Telmex, enterprise, government
Notes
Telmex flagship. ICREA Level 6. About 37.5 MW. Oracle Cloud Mexico on-net. Largest incumbent Mexican hall. Complements Equinix MX and KIO QRO.