Under construction
Colocation
Liquid cooling
Tier III

Triara Northeast

Triara (Telmex) · Northeast

Planned IT
12 MW
Free to lease
12 MW
$ / kW·mo
$88
White space
68k ft²

Inventory

0% occupied

Power

12 MWlive

12 MW to lease · 0 MW in use

White space

68k ft²total

68k ft² free · occupied

6,334 m² · 6,334 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease12 MW
Utility feed
Campus / planned12 MW

Power cost

$88/kW·mo

9.6¢ industrial · 12¢ after PUE 1.25

Per MW·year
$1.1M
This site · 12 MW
$13M/yr
12 kW rack
$1,051/mo
3.2¢ cheapdear 22.4¢

3.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.4M/yr less.

CFE Nuevo Leon · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
25%
Rack density
12 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Monterrey, Nuevo Leon, Mexico

Northeast Mexico

25.712°, -100.284° · North America

Tenants / users

Cloud, enterprise, nearshore

Notes

Sixth Triara hall, announced Nov 2025 by Hector Slim Seade. Northeast Mexico, 2026. Complements live Monterrey Triara.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.