Triara Monterrey
Triara (Telmex) · MTY
- IT live
- 12 MW
- Free to lease
- 1.4 MW
- $ / kW·mo
- $88
- White space
- 139k ft²
Inventory
88% occupiedPower
12 MWlive
1.4 MW to lease · 10.6 MW in use
White space
139k ft²total
10k ft² free · 129k ft² occupied
13k m² · 929 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$88/kW·mo
9.6¢ industrial · 12¢ after PUE 1.25
- Per MW·year
- $1.1M
- This site · 12 MW
- $13M/yr
- 8 kW rack
- $701/mo
3.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.4M/yr less.
CFE Nuevo Leon · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2009
- Renewable match
- 25%
- Rack density
- 8 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Monterrey, Nuevo Leon, Mexico
Monterrey, Nuevo Leon
25.687°, -100.316° · North America
Tenants / users
Oracle Cloud, Telmex, enterprise, manufacturing
Notes
Original Triara hall (2009). Oracle Cloud Mexico second AZ reported on-net. Complements Equinix MO1/MO2 and KIO MTY1.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.