Planned
Colocation
Liquid cooling
Tier III

Tomakomai AI Factory

Kankyo Friendly HD · Tomakomai

Planned IT
10 MW
Free to lease
10 MW
$ / kW·mo
$144
White space
25k ft²

Inventory

0% occupied

Power

10 MWlive

10 MW to lease · 0 MW in use

White space

25k ft²total

25k ft² free · — occupied

2,323 m² · 2,323 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease10 MW
Utility feed—
Campus / planned10 MW

Power cost

$144/kW·mo

17.2¢ industrial · 19.8¢ after PUE 1.15

Per MW·year
$1.7M
This site · 10 MW
$17M/yr
40 kW rack
$5,776/mo
3.2¢ cheapdear 22.4¢

5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.

Japan industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
80%
Rack density
40 kW
Voltage
PUE
1.151.00 ideal · 1.60 typical
Power source
Hokkaido Electric plus on-site wind and solar. Cool-climate free cooling.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tomakomai, Hokkaido, Japan

Tomakomai, Hokkaido

42.637°, 141.603° · Asia

Tenants / users

AI, green cloud

Notes

10 MW Tomakomai AI factory (AI Tech Tomakomai). Early-stage Hokkaido industrial-port colo.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.