Thésée DataCenter 1 Aubergenville
Thésée DataCenter · Aubergenville
- IT live
- 3 MW
- Free to lease
- 0.3 MW
- $ / kW·mo
- $91
- White space
- 391k ft²
Inventory
89% occupiedPower
3 MWlive
0.3 MW to lease · 2.7 MW in use
White space
391k ft²total
2,062 ft² free · 389k ft² occupied
36k m² · 192 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 59.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$91/kW·mo
10.4¢ industrial · 12.5¢ after PUE 1.20
- Per MW·year
- $1.1M
- This site · 3 MW
- $3.3M/yr
- 10 kW rack
- $911/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.3M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2021
- Renewable match
- 90%
- Rack density
- 10 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Aubergenville, Île-de-France, France
32 rue du Clos Reine, 78410 Aubergenville
48.958°, 1.855° · Europe
Tenants / users
Enterprise, government, sovereign colo — French-law campus
Notes
Uptime Tier IV. Caisse des Dépôts / IDEC. Live 3 MW hall; 50 MW campus of 5-10 MW modules under construction. Dual-site with Voisins-le-Bretonneux TDC2.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.