Tetracore Atakobo
Tetracore Energy · Atakobo Energy Park
- Planned IT
- 20 MW
- Free to lease
- 20 MW
- $ / kW·mo
- $118
- White space
- 83k ft²
Inventory
0% occupiedPower
20 MWlive
20 MW to lease · 0 MW in use
White space
83k ft²total
83k ft² free · — occupied
7,742 m² · 7,742 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$118/kW·mo
12.6¢ industrial · 16.1¢ after PUE 1.28
- Per MW·year
- $1.4M
- This site · 20 MW
- $28M/yr
- 20 kW rack
- $2,355/mo
3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $21M/yr less.
Nigeria grid + diesel · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 20%
- Rack density
- 20 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- National grid plus on-site generators. N+1 ride-through.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ijebu East, Ogun, Nigeria
Atakobo Energy Park, Ijebu East, Ogun State
6.750°, 4.200° · Africa
Tenants / users
Hyperscale pipeline, Huawei adjacency
Notes
$400m 20 MW Tier III campus with Huawei and Inspirive. Behind-the-meter energy park thesis.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.