Planned
Colocation
Liquid cooling
Tier III

Tetracore Atakobo

Tetracore Energy · Atakobo Energy Park

Planned IT
20 MW
Free to lease
20 MW
$ / kW·mo
$118
White space
83k ft²

Inventory

0% occupied

Power

20 MWlive

20 MW to lease · 0 MW in use

White space

83k ft²total

83k ft² free · occupied

7,742 m² · 7,742 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease20 MW
Utility feed
Campus / planned20 MW

Power cost

$118/kW·mo

12.6¢ industrial · 16.1¢ after PUE 1.28

Per MW·year
$1.4M
This site · 20 MW
$28M/yr
20 kW rack
$2,355/mo
3.2¢ cheapdear 22.4¢

3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $21M/yr less.

Nigeria grid + diesel · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
20%
Rack density
20 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
National grid plus on-site generators. N+1 ride-through.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ijebu East, Ogun, Nigeria

Atakobo Energy Park, Ijebu East, Ogun State

6.750°, 4.200° · Africa

Tenants / users

Hyperscale pipeline, Huawei adjacency

Notes

$400m 20 MW Tier III campus with Huawei and Inspirive. Behind-the-meter energy park thesis.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.