Planned
Neocloud
Air cooled

TeraWulf Muskie Data Campus

TeraWulf · EastPark Industrial Park

Planned IT
1 GW
Remaining
—
$ / kW·mo
$76
White space
—

Inventory

0% occupied

Power

1 GWcampus

0 MW pipeline · 0 MW in use

White space

—total

— free

—

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining—
Utility feed—
Campus / planned1 GW

Power cost

$76/kW·mo

8¢ industrial · 10.4¢ after PUE —

Per MW·year
$911k
This site · 1 GW
$911M/yr
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $547M/yr less.

US industrial · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
345 kV
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ashland, Kentucky, United States

EastPark Industrial Park, Boyd and Greenup Counties, KY

38.430°, -82.770° · North America

Notes

285-acre HPC/AI campus at EastPark (Boyd and Greenup counties) acquired by TeraWulf May 2026. Amended Kentucky Power agreement signed Oct 1 2026 raises contracted load from 500 MW to 1 GW and pulls the second 500 MW phase forward to 2029 (pending KPSC approval); first phase ramps from 2028. Kentucky Power is building a 765/345 kV substation. Coordinates: EastPark area (approximate). Sources: https://investors.terawulf.com/news-events/press-releases/detail/146/terawulf-expands-contracted-power-capacity-at-its-muskie-data-campus-to-1-gw https://www.kentuckypower.com/lib/docs/company/about/MDC_Power_Fact_Sheet_Oct_2026.pdf

Compiled from public filings, operator pages, and reporting. Not an official operator specification.