TeraWulf Muskie Data Campus
TeraWulf · EastPark Industrial Park
- Planned IT
- 1 GW
- Remaining
- —
- $ / kW·mo
- $76
- White space
- —
Inventory
0% occupiedPower
1 GWcampus
0 MW pipeline · 0 MW in use
White space
—total
— free
—
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$76/kW·mo
8¢ industrial · 10.4¢ after PUE —
- Per MW·year
- $911k
- This site · 1 GW
- $911M/yr
2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $547M/yr less.
US industrial · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- 345 kV
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ashland, Kentucky, United States
EastPark Industrial Park, Boyd and Greenup Counties, KY
38.430°, -82.770° · North America
Notes
285-acre HPC/AI campus at EastPark (Boyd and Greenup counties) acquired by TeraWulf May 2026. Amended Kentucky Power agreement signed Oct 1 2026 raises contracted load from 500 MW to 1 GW and pulls the second 500 MW phase forward to 2029 (pending KPSC approval); first phase ramps from 2028. Kentucky Power is building a 765/345 kV substation. Coordinates: EastPark area (approximate). Sources: https://investors.terawulf.com/news-events/press-releases/detail/146/terawulf-expands-contracted-power-capacity-at-its-muskie-data-campus-to-1-gw https://www.kentuckypower.com/lib/docs/company/about/MDC_Power_Fact_Sheet_Oct_2026.pdf
Compiled from public filings, operator pages, and reporting. Not an official operator specification.